Step 1 of 3
Understand it
The short answer, then why it happens.
The short answer
Fall prep comes down to one idea: give water fewer ways into the walls before it starts freezing. Clear the gutters and make sure the downspouts drain away from the house. Close open joints, cracks and failed caulk while the weather is still dry and mild. Take care of loose steps, lifted pavers and soft spots. Larger work waits for reliable above-freezing temperatures or has to be protected, so plan big repairs for spring.
Why fall is the season for small repairs
Brick, stucco, concrete and paint all behave well while they stay dry.
The trouble begins when water gets into a small gap and then freezes. Ice takes up more room than water, so it pushes the gap wider, and every thaw lets more water follow it in. A joint that could be closed in an afternoon in October can turn into a flaking brick face by March.
That is why the work worth doing now is the small, protective kind. You are not trying to renovate before winter. You are shutting the doors that water uses.
There is also a practical limit. Sealants, mortars and coatings each list a minimum temperature on the product label, so check it before you start. In the fall there is a window, and it can close faster than people expect.
Gutters, downspouts and the ground
Start at the top of the water path.
Gutters packed with leaves can overflow in heavy rain and run water down the face of the wall, where it can freeze. Clear them after most of the leaves have fallen, not before, or plan on doing it twice.
Check that every downspout carries water well away from the foundation. A splash block or a short extension makes a large difference. Where a downspout empties right at the base of a wall, the lower courses of brick or the bottom of the stucco take the brunt of it all winter.
Look at the ground against the foundation too. If it has settled so water collects there, add soil and slope it away from the house before the ground freezes.
Walls: close the openings
Walk the house and look for open joints in the brick, cracks in the stucco and caulk that has split or shrunk.
Failed caulk around windows, doors and where different materials meet is one of the most common ways water gets behind a wall, and it is also one of the easiest things to fix.
For fine cracks in stucco, a proper flexible sealant applied to a clean, dry crack will do the job through the winter. Wider or growing cracks, and anything with a stain trailing below it, are a different matter. Photograph them, measure them and have someone look before you cover them over.
Mortar work in cold weather needs heating and protection, so larger repointing waits for reliable above-freezing temperatures or is protected. If the weather has already turned, wait.
Paving, steps and the chimney
Hard surfaces take a beating from freeze and thaw, so check them before the cold.
Look for lifted pavers, steps that have pulled away from the house, concrete with flaking surfaces and joints where sand or sealant has washed out. A loose paver reset in October stays put. One left alone can let water under the whole run.
Plan ahead for de-icing salt. It speeds up surface damage on concrete and can stain and attack masonry. Many owners choose a gentler product or shovel early and often so there is less to melt.
Look up at the chimney. A cracked crown or open joints near the top let water into the brick, where it will freeze repeatedly. If you see damage, get it photographed and looked at before winter, because a chimney cannot be safely worked on in ice and wind.
Paint and wood
Exposed wood is the first thing to go when paint fails.
Look at trim, sills and fascia for bare patches or flaking. Small areas can be scraped, primed and touched up in a dry spell, which protects the wood through the winter.
Full repainting of a house is best left to a time with steady dry weather and mild nights. A coat that is applied cold and damp may look fine for a few weeks and then fail early. If you are considering a full job, plan it for spring and use the fall to stop any bare wood from soaking up another winter.
What to leave until spring
Not everything should be done now.
Large repointing, stucco patching and concrete work wait for reliable above-freezing temperatures, or have to be protected while they cure. If the forecast has turned, plan them for spring.
Spend the fall getting a clear list and photos, so you can book spring work early while the schedule is open. If you want help deciding what falls in which pile, send us pictures and we will sort them with you.
Step 3 of 3
Act on it
Quick answers, where to read next, and how we can help.
Questions people ask
What is the most important thing to do in fall?
Get water to leave the house cleanly. Clear gutters, extend downspouts and fix any slope that lets water settle at the foundation. Everything else on the exterior lasts longer when the water is managed.
Can I repoint brick in cold weather?
It depends on the temperature and the forecast. Cold-weather mortar work needs heating and protection, so larger jobs wait for reliable above-freezing temperatures or are protected. If the week ahead is cold, wait for spring.
Should I seal cracks in my stucco before winter?
Fine hairlines can be closed with a flexible sealant on a clean, dry surface. Wider or growing cracks should be photographed and looked at first, because sealing over a moisture problem can hide it.
When is it too late for exterior paint?
When the surface is damp or the temperature is below what the paint label allows. For small touch ups on bare wood, a dry mild day is enough. For whole walls, spring is the safer choice.
Do I need a professional for any of this?
Gutters, caulk and soil can be handled by most owners. Brick, stucco, chimney and concrete problems are worth a look from someone who does that work, especially if the damage is widening.
Seeing this at your place?
Send us a few photos through the contact page and the chat there, and we'll tell you what we think.